Gap Filler Detail

1963 – National Archives of Canada


MINUTE SHEET
Min (9)

File: S10-136-80/5 TD2269 (DCEP)
Date: 31 Jan 63

Referred to: DCEM

Algonquin ParkNicolet
BelleterreScotch Settlement
Elliot LakeSt Joseph
FormosaTobermory
Lac Ste MarieTodd Mtn
 Timmins

________________________________________________________________________

The following is a list of work to be done at above stations, subject to confirmation during spring visit.

Items common to all Stations

  1. Check and test electrical, mechanical, plumbing, fire alarm and grounding systems and correct deficiencies.

  2. Check and test fuel oil system and rain water system and correct deficiencies.

  3. Install diesel alternator set and associated equipment. Complete fuel oil supply, ventilation, exhaust, control cabinet, distribution panels, and connection to commercial power sub-station using 500 MCM cables. This work could be done by Sheridan Equipment Ltd. (hand written note: could or will?)

  4. Commercial Power line and sub-station to be done by power company or by contract.

  5. Remove all temporary plywood covers as required.

Special Items

Algonguin Park - Nil

Belleterre

Elliot Lake

Formosa - Security Fencing

Lac Ste Marie

Nicolet

Scotch Settlement - Nil

St Joseph - Nil

Tobermory - Louvre controls

Todd Mtn

Timmins - Nil

(MC Hyslop) W/C
DCEP
2-5777