S10-136-80/5b(DCEP)
MEMORANDUM
4 June 63
DCEM
Care and Custody
Gap Filler Radar Stations
Further to previous correspondence regarding care and custody of Gap Filler Radar Stations where buildings have been erected, it is requested that ADC be asked to thoroughly ventilate the buildings during their inspection trips.
It has been reported that the floor tiles are lifting and interior painting deteriorating due to moisture collecting in the closed up buildings.
(SE Martin) W/C
Acting DCEP
2-3442