S10-136-80/5 (JDPG)
MEMORANDUM
11 Aug 59
CCE/Prop
Gap Filler Radar Stations - Pinetee
Permission to Enter for Field Survey & Soil Investigation
In the case of (c) and (d) above, it is suggested that the DOT land agent contact the Consulting Engineer and arrange for a joint trip to the site. Additional information about these sites is given in the attached appendices.
(JW Griffith) G/C
A/CCE
2-5777