10-36-80/5 (DCEP)
MEMORANDUM
26 Nov 63
D Eng C
Loop Road Design
Gap Filler Radar Stations
The loop road concept for the gap filler radar stations was conceived at the beginning of the gap filler programme and was developed in order to meet the following requirements.
May we please be advised whether the above mentioned operational requirements will be met at sites having steep slopes, such as Beaver Tower (B50-8-1000-1), Gowganda (C28-8-1000-2), L'Ascension (L39-8-1000-1), Nishkotea Lake (N24-8-1000-1), and Taschereau (LGL 180-254)?
(MC Hyslop) W/C
DCEP
2-5777