10-36-80/5 (JDPG)
MEMORANDUM
30 Jun 60
ATSC
Gap Filler Radar Stations
Telecom Equipment Layout
It is understood that there is a further change in the proposed telecom equipment for the Gap Filler Radar Stations under consideration.
As CCE will be able to proceed with the design of the standard building as soon as TB approval has been received, it is requested that CCE/JDPG be advised of what changes will be made to the building structure, what the new equipment layout will be and what the physical dimensions and weights of the components will be.
If the above information is not available at the present time, it is requested that CCE/JDPG be advised of what the probable date might be in order that the possible delay in starting the design work might be determined.
(JW Griffith) G/C
A/CCE
2-5777