S949-108 (ATSC)
5 Jul 60
Minute (2)
Ref S955-103-1 (DRDP) 7 Mar 60
10-36-80/5 (JDPG) 30 Jun 60
A/CCE
Following a verbal query from Eng 5-5 on 21 Jun 60 regarding an equipment layout for the FPS63 radar, ROZMA/CADIN was contacted by telephone. S/L Anderson stated that no equipment layout had been made to fit the FPS63 equipment into the proposed Armco building. Since the reference of 7 Mar 60 had stated that "the present building and tower design as agreed upon with GEEIA/CADIN will still be valid", it was assumed by ROZMA/CADIN that the FPS63 equipment layout would be similar to that for the FPS18.
The possibility that the Bendix proposal may make a change in the tower and building was anticipated, the CTel representative at the ESC meeting of 7-8 Jul 60 to study the Gap Filer question was supplied with a list of queries. (see App "A").
It is hoped that the CTel representative at the above meeting will return with sufficient information to anwer the questions posed in para 2 of the reference of 30 Jun 60.
(WE Johnston) W/C
TSC 3
6-8977
APPENDIX "A"
GAP-FILLER MEETING - ESC 7-8 JUL 60
Will Bendix proposal mean any changes to the FPS-18 tower? including forestry mod? It must not change tower!