10-36-80/5 (JDPG)
MEMORANDUM
30 Nov 59
ATSC/TSC-2
Gap Filler Radar Stations - Various
Radar Building Using Armco Products
Further to ATSC and CCE meeting at GEEIA Rome NY on 19 Nov 59, it is requested that the following Armco drawings be forwarded to CTel representatives at GEEIA for use by USAF personnel in preparing revised equipment layout utilizing an Armco Building.
Instruction Sheet No | Title & Remarks |
---|---|
E2-1E | Typical Details, showing wall, roof and ceiling construction |
E2-2 | Building Layout (see E2-7EE) |
E2-3 | Base Channel Layout. Note "L" and "W" are out to out of building and inside dimensions are 6-1/4" less. |
E2-4 | Wind Bent Layout. Number of wind bents will depend on length of building, probably one only. |
E2-5 | Wind Bent Assembly. It is o be noted that this would be the only obstruction within the building. |
E2-6 | Wall Panel Erection, showing method of erecting 16" panels. Interior will be finished with dry-wall construction. Clear ceiling height of 10'0" can be provided using 10'9-1/4" panels in RCAF Stock. |
E2-7EE | Wind Bracing Layout. Note that lay length can be 6'8", 8'10", 9'4", 10'8" or 12'0", therefore, length of building could be 40'0" or as required by equipment. |
(JW Griffith) G/C
A/CCE
2-5777