Gap Filler Detail

1960 – National Archives of Canada


Classification SECRET

File Reference:S10-136-80/5 TDO329

MINUTE SHEET

9 Dec 60

TO: CCE (thru COR).

Subsequent to your Treasury Board submission for 38 gap fillers in Dec 1959, there was joint USAF/RCAF agreement on a major change in the northern boundaries of radar coverage and a new interpretation of "500' above flyable terrain". This is explained in detail in the attached Appendix "A" - "Concept of Operations" and "Gap Filler Criteria" which was received from USAF/ADCHQ and concurred in by NORAD.

This required a complete re-evaluation of the 45 CADIN gap fillers which subsequently resulted in the relocation of 22 gap fillers.

In support of your submission for funds for the field survey task in Jul 60, ATSC memorandum S949-105 TDO165P dated 13 Jun 60 was sent to A/CCE thru DADSI. Attached herewith as Appendix "B" is a copy of this memorandum for easy reference. You will note this memorandum contains a review of events leading up to the field surveys which resulted from the aforementioned changes in criteria.

You have received under separate cover, copies of the Minutes of a Joint USAF/RCAF Site Evaluation meeting held on 28-29 Nov 60, which examined the entire 45 gap filler deployment and approved the locations of 43 gap filler sites, leaving 2 to be relocated early in 1961.

The 43 approved sites are broken down as follows:-

  1. The following 21 sites were previously approved by TB and their locations remain unchanged:-

    CG1Nobel OntCG12La Tuque PQ
    2 Nicolet PQ13Todd Mtn NB
    3Tobermory Ont14Timmins Ont
    4St Joseph NS15Belleterre PQ
    5Formosa Ont16Nipigon Ont
    6Scotch Settlement17Atikokan Ont
    7Lac Ste Marie PQ19Biscotasing Ont
    8Algonquin Park Ont20 Marathon Ont
    9Elliott Lake Ont27 Batchawana Ont
    10Oba Ont28 Eaglet River Ont
    11Chapleau Ont  

  2. The following 17 sites were also previously approved by TB but have been relocated as indicated to provide optimum radar coverage within the stipulated criteria. In many cases there is a significant difference in the geographic locations and/or estimated costs as contained in the field siting reports.

      Relocated from the
    following TB approved sites
    CG18Westport Ont (relocated)Westport
    21Shemogue NBMt Carleton
    22Bridgetown NSNew Yarmouth
    23Hastings OntBuckhorn
    26Lucknow OntRedditt
    29L'Anse St Jean PQPort Nuef
    30Summerville Centre NSAlder River
    31L'Ascencion PQLa Macaza
    32Nishkotea Lake PQLac des Loups
    35Whitefish Lake OntSilver Falls
    36Squatteck PQLes Etroits
    37Beaver Tower PQSt Cleophas
    39Gold Rock OntFt Francis
    40White Brook NBMt Carleton NB
    42St Adalbert PQSt Cecile
    43Graham Ont (relocated)Graham
    44Manitouwadge OntGeraldton

  3. The following are 5 new sites which have not yet been submitted for TB approval:-

    CG24Stoney Creek Ont
    25Sparta Ont
    33Mattawa Ont
    34Gowganda Ont
    38Taschereau PQ

In accordance with your Min (1), this accounts for the 45 gap fillers as contained in the CADIN Document and should provide the additional support you require for your proposed TB submission for funds.

(EC Poole) A/C
CTel
6-6627

cc:COR

App "A" - Concept of Operations & Gap Filler Criteria

App "B" - Siting CADIN Gap Fillers