Gap Filler Detail

1962 – National Archives of Canada


62-702-S42-1

Aug 9/62

Mr JD McIlveen,
Branch Manager,
Toronto, Ont

Gap Filler - Sparta

Please refer to your status report dated July 31st.

Work on the access road should be stopped immediately. The foundations should be stripped and backfilled and the site left in a tidy condition. Steelox components and diesel generators will not be shipped.

In respect to the land option, which you mention specifically in this case, the Properties Department will be dealing with the present owner.

LB Briden,
Assistant Chief Engineer,
(Field Projects).