122-7-193-S39-1
Aug 8/62
Mr DE Bastedo,
Branch Manager,
Halifax, NS
Gap Filler - St Joseph, NS
Please refer to your report of August 1, 1962.
Since this job is now essentially complete it is to be completed with the exception of any further work on the Diesel Generator and the Electrical Control Panel. Both of these items will be shipped to an RCAF Depot for storage until the deferment order on this program is lifted. Instructions regarding the shipping and storage of the Panel and Generating set will be forwarded to you as soon as possible.
LD Briden,
Assistant Chief Engineer,
(Field Projects)