- Interior photo within the Power Plant - May 1976.
Four Orenda gas turbine generators, of which two were on line at all times.
Courtesy David Connolly.
- Interior photo within the Power Plant - May 1976.
Orenda 1600 hp gas turbine with reduction gearbox.
Courtesy David Connolly.
- Interior photo within the Power Plant - May 1976.
Orenda OTC5 dual fuel industrial gas turbine.
Courtesy David Connolly.
- Interior photo within the Power Plant - May 1976.
Power Plant generator switchgear.
Courtesy David Connolly.
|