APPENDIX "B"
Description of Buildings
Bldg No.1 - MESS HALL
Frame Construction.
Interior sheathed with gyproc
Floors - hardwood with exception of one room which was covered with linoleum.
Ceiling - lined with donnaconna board
Exterior covered with cedar shingles
Roof - rubberoid shingles
2 - brick chimneys
DH windows C/W storm sash
3 - 2 Compartment galv. iron sinks
1 - Walk-in refrigeration box (less Unit
1 detex station #5 C/W key
1 toilet
1 washbasin
2 hose bibs - garbage room
1 steam jet - garbage room
2 fuse panels
1 thermostat
18 Ceiling fixtures (drop type)
9 wall plugs
2 Sq D switches
1 switch box
Boiler Room (attached)
Frame construction
Concrete foundation
Interior lined with asbestos
1 - E.Leonard & Sons coal burning boiler set for 15 lbs.
C/W pressure gauge and water glass less condensate return pump and motor.
3 ceiling fixtures (drop type)
Box and switch plates missing
1 Sq D switch.
Bldg No.2 - GUARD HOUSE
Frame construction
Wood floors X 4 T & G
Interior lined with painted gyproc
Ceilings donnaconna board
Exterior walls covered with cedar shingles
Roof - rubberoid
2 toilets
2 wash basins
1 detex station #1 C/W key
1 fuse box
1 Sq D switch
9 light fixtures
4 wall plugs 6 switches
1 pot bellied stove.
Bldg No.3 - SERVICE GARAGE
Frame construction on concrete foundation and concrete floor
Interior sheathed with 1 X 4 T&G
Exterior walls covered with cedar shingles
Roof - rubberoid
3 ceiling fixtures
4 wall plugs
1 switch
3 - reset switches
1 - 1000 gal tank
Bldg No.4 - OR AND NCO QUARTERS
Frame construction
Hardwood flooring
Interior lined with painted gyproc
Ceilings lined with donnaconna board
Exterior walls covered with cedar shingles
Roof - rubberoid
DH windows C/W storm sash
NCO's Side
2 toilets
2 basins (1 disconnected)
2 showers C/W heads
1 - 3 ft urinal
1 - 800 gal hot water tank. C/W instantaneous heater
1 detex station #4
Hospital Portion
1 toilet
1 basin
OR Portion
16 basins
1 - 2 compartment laundry tray (enamelled cast iron), less taps
1 - 5 ft urinal
6 toilets
7 showers less 6 heads
4 outside light fixtures
4 hall ceiling fixtures
24 switches
1 Sq D switch box
37 wall plugs
19 ceiling fixtures (suspended type)
20 ceiling fixtures (hanging chain type)
Bldg #5 - OFFICERS QUARTERS AND ADMINISTRATION
Frame construction
Hardwood flooring
Interior walls lined with painted gyproc
Ceilings donnaconna board
Exterior walls covered with cedar shingles
Roof - rubberoid
2 basins
2 toilets
1 shower less head
1 detex station #7.
2 outside light fixtures
1 Sq D box
14 single switches
12 wall plugs
18 ceiling fixtures (chain type)
1 fuse panel
1 ceiling fixture (fixed type)
7 large bowl type ceiling fixtures
27 medium size bowl type ceiling fixtures.
23 small size bowl type ceiling fixtures
35 medium size reflectors
7 large reflectors
9 small reflectors
3 desk lamp reflectors
Bldg #6 - PUMPHOUSE
Frame construction on concrete base
Concrete floor
Interior lined with gyproc
Exterior walls covered with cedar shingles
Roof - rubberoid.
1 - 100 gal pressure tank
1 - wall plug
1 - 3 gang switches
1 - thermostat
1 - magnetic switch box
1 - reset switch box
3 - Sq D switch boxes
1 - fuse panel
2 - Ceiling light fixtures
1 - outside light fixtures
Bldg #7 - POWER HOUSE
Frame constuction on concrete foundation
Concrete floor
Interior lined with asbestos millboard
Exterior walls covered with cedar shingles
Steel sash
Metal lined doors (2)
One detex station #2
Roof - rubberoid
Hold down bolts for motor badly bent.
4 drop light fixtures
1 fuse panel
1 switch box
Bldg #8 - OPERATIONAL BUILDING
Frame construction on concrete foundation
Wood floors with linoleum
Interior lined with painted gyproc
Ceiling donnaconna board
DH window C/W storm sash less 1 storm sash
1 work bench
1 detex station #3
1 toilet
1 basin less 1 tap
10 ceiling fixtures
5 wall plugs
6 wall switches
4 switch boxes (reset)
5 drop light fixtures
1 thermostat
1 combination wall switch and plug
1 Do Rad Boiler
1 - 10 gal tank.
Bldg #9 - COAL STORAGE
Frame building constructed of rough lumber
Engineer's Office
Frame construction
Open studding
Exterior cedar shingles
Roof - rubberoid
Steam heating
Supplied to all blgs except 2, 7, 8 and engineer's officer by means of mechanical distribution. Boiler is located at rear of Mess Hall.
Water Supply
Water supply to be supplied from artesian well located in bldg #6. As pump and motor were missing a test could not be made.
Power Supply
Formerly 2300 Volt power was supplied from 3 diesel electric plants. Facilities are still connected to all buildings but units have been shipped to #8 CMU (see appendix "C").
Sewage disposal
Sewage disposal was made as indicated on drawing 360-30-57-2.
Boundaries
The site was bounded by perimeter fencing as indicated on drawing 360-30-57-2.